View all incentives

NH NEVI Round 2

New Hampshire incentive

Industry:

The New Hampshire Department of Transportation (NHDOT) has approximately $9.6M available through their NEVI Phase II program. The state has selected 12 suggested corridor locations, including Conway (US-302), Errol (NH-16 AFC), Gorham (NH-16/US-2), Lancaster (US-2), Claremont (NH-11/NH-12), New London (I-89 AFC), Henniker (NH-9), Keene (NH-101), Epping (NH-101), Northwood (US-4), Littleton (US-302 AFC), and Carroll (US-302 AFC). Sites along federally designated Alternative Fuel Corridors (AFCs) are prioritized. Each site must include a minimum of four (4) DC fast charging (DCFC) ports capable of 150kW simultaneous charging (600 kW minimum total output). The federal share covers up to 80% of Total Eligible Costs, with a required minimum 20% match. This is a competitive program and applications are due on August 21, 2026.

Learn more